• Site Ready Application

  • Site Ready applications are accepted year-round by the Oklahoma Department of Commerce.

    Oklahoma Site Ready certification helps you meet the demand for project-ready sites and provides a competitive advantage over other properties. This can translate to economic growth and job opportunities for your community.

  • Property Application Type

  • Aerospace Requirements

    Complete this section to ensure the site meets basic requirements prior to application.
  • Is site a minimum of 50 net contiguous developable acres and configured to support the site development plan?
  • Is site zoned for aerospace use or can you provide evidence of public support for rezoning?
  • Browse Files
    Cancelof
  • Are the minimum of 50 developable acres located in an area determined to be outside the FEMA 100-year flood plain?
  • Are the minimum of 50 developable acres free of wetlands, protected species, or other environmental issues; or is there a plan of mitigation achievable within 180 days?
  • Browse Files
    Cancelof
  • Is site served by adequate electrical, natural gas, water and sewer utilities for the project type?
  • Browse Files
    Cancelof
  • Is site adjacent to a commercial service airport with a 5,500 ft runway?
  • Is the site free of FAA structural height restrictions in place within the park?
  • Browse Files
    Cancelof
  • If you are able to answer yes and/or have the necessary supplemental or mitigation documentation request for each item, your site may meet the requirements of the Site Ready program. Please continue your application. You may save your work and return later.

    If you had to answer no to any of these questions and do not have the required supplemental or mitigation documentation, your site likely does not qualify. Please contact us for assistance at 405-815-6552 and ask to speak to a Site Ready specialist.

  • Business Services Park

  • Is site located in an area with a population of at least 25,000 within a 50-mile radius?
  • Is site a minimum of 10 net contiguous developable acres and configured to support the site development plan?
  • Is site zoned for a business/commerce park or office park capable of building-out up to 600,000 square feet?
  • Browse Files
    Cancelof
  • Are the minimum of 10 developable acres located in an area determined to be outside the FEMA 100-year flood plain?
  • Are the minimum of 10 developable acres free of wetlands, protected species, or other environmental issues?
  • Browse Files
    Cancelof
  • Is site served by adequate electrical, natural gas, water and sewer utilities for the project type?
  • Browse Files
    Cancelof
  • Is site served by a T-1 line or equivalence, or a fiber optic infrastructure or equivalent service with at least 155.5 Mbps bandwidth?
  • Browse Files
    Cancelof
  • If you are able to answer yes and/or have the necessary supplemental or mitigation documentation request for each item, your site may meet the requirements of the Site Ready program. Please continue your application. You may save your work and return later.

    If you had to answer no to any of these questions and do not have the required supplemental or mitigation documentation, your site likely does not qualify. Please contact us for assistance at 405-815-6552 and ask to speak to a Site Ready specialist.

  • Heavy Industrial

  • Is site located in an area with a population of at least 25,000 within a 75-mile radius?
  • Is site a minimum of 40 net contiguous developable acres and configured to support the site development plan?
  • Is site properly zoned for Heavy industrial?
  • Is site served by rail?
  • Browse Files
    Cancelof
  • Are the minimum of 40 developable acres located in an area determined to be outside the FEMA 100-year flood plain?
  • Are the minimum of 40 developable acres free of wetlands, protected species, or other environmental issues?
  • Browse Files
    Cancelof
  • Is site served by adequate electrical, natural gas, water and sewer utilities for the project type?
  • Browse Files
    Cancelof
  • Is site served by fiber optic infrastructure or equivalent service?
  • Browse Files
    Cancelof
  • If you are able to answer yes and/or have the necessary supplemental or mitigation documentation request for each item, your site may meet the requirements of the Site Ready program. Please continue your application. You may save your work and return later.

    If you had to answer no to any of these questions and do not have the required supplemental or mitigation documentation, your site likely does not qualify. Please contact us for assistance at 405-815-6552 and ask to speak to a Site Ready specialist.

  • Light Industrial

  • Is site located in an area with a population of at least 12,500 within a 75-mile radius?
  • Is site a minimum of 15 net contiguous developable acres and configured to support the site development plan?
  • Is site within 10 miles, via truck route, of an Interstate or limited access, 4-lane improved highway system?
  • Is site properly zoned for light industrial?
  • Browse Files
    Cancelof
  • Are the minimum of 15 developable acres located in an area determined to be outside the FEMA 100-year flood plain?
  • Are the minimum of 15 developable acres free of wetlands, protected species, or other environmental issues?
  • Browse Files
    Cancelof
  • Is site served by adequate electrical, natural gas, water and sewer utilities for the project type?
  • Browse Files
    Cancelof
  • Is site served by a T-3 line (fiber optic line or equivalent service preferable)?
  • Browse Files
    Cancelof
  • Is site within 90 miles of a commercial service airport?
  • If you are able to answer yes and/or have the necessary supplemental or mitigation documentation request for each item, your site may meet the requirements of the Site Ready program. Please continue your application. You may save your work and return later.

    If you had to answer no to any of these questions and do not have the required supplemental or mitigation documentation, your site likely does not qualify. Please contact us for assistance at 405-815-6552 and ask to speak to a Site Ready specialist.

  • Research & Development Park

  • Is site a minimum of 5 net contiguous developable acres and configured to support the site development plan?
  • Is site properly zoned for research and development?
  • Browse Files
    Cancelof
  • Are the minimum of 5 developable acres located in an area determined to be outside the FEMA 100-year flood plain?
  • Are the minimum of 5 developable acres free of wetlands, protected species, or other environmental issues?
  • Browse Files
    Cancelof
  • Is site served by adequate electrical, natural gas, water and sewer utilities for the project type?
  • Browse Files
    Cancelof
  • Is site located within a Class A park setting or can it be developed as such?
  • Is site within 60 miles of a University with Ph.D. programs and R&D support or activity?
  • Is site within 90 miles of a commercial service airport?
  • Is site served with a fiber OC-3, or equivalent service with at least 155.5 Mbps bandwidth?
  • Browse Files
    Cancelof
  • If you are able to answer yes and/or have the necessary supplemental or mitigation documentation request for each item, your site may meet the requirements of the Site Ready program. Please continue your application. You may save your work and return later.

    If you had to answer no to any of these questions and do not have the required supplemental or mitigation documentation, your site likely does not qualify. Please contact us for assistance at 405-815-6552 and ask to speak to a Site Ready specialist.

  • Mega Park

  • Is site located in an area with a population of at least 200,000 within a 75-mile radius?
  • Is site a minimum of 1,000 net contiguous developable acres and configured to support the site development plan?
  • Is site located within 10 miles, via truck route, of an Interstate or limited access, 4-lane improved highway system?
  • Is site properly zoned for heavy industry?
  • Browse Files
    Cancelof
  • Are the minimum of 1,000 developable acres located in an area determined to be outside the FEMA 100-year flood plain?
  • Are the minimum of 1,000 developable acres free of wetlands, protected species, or other environmental issues?
  • Browse Files
    Cancelof
  • Is site served by adequate electrical, natural gas, water and sewer utilities for the project type?
  • Browse Files
    Cancelof
  • Is site served with a fiber optic line or equivalent service?
  • Browse Files
    Cancelof
  • If you are able to answer yes and/or have the necessary supplemental or mitigation documentation request for each item, your site may meet the requirements of the Site Ready program. Please continue your application. You may save your work and return later.

    If you had to answer no to any of these questions and do not have the required supplemental or mitigation documentation, your site likely does not qualify. Please contact us for assistance at 405-815-6552 and ask to speak to a Site Ready specialist.

  • Warehouse/Distribution Park

  • Is site a minimum of 50 net contiguous developable acres and configured to support the site development plan?
  • Is site located within 5 miles, via truck route, of an Interstate or limited access, 4-lane improved highway system?
  • Is site properly zoned for warehouse/distribution?
  • Browse Files
    Cancelof
  • Are the minimum of 50 developable acres located in an area determined to be outside the FEMA 100-year flood plain?
  • Are the minimum of 50 developable acres free of wetlands, protected species, or other environmental issues?
  • Browse Files
    Cancelof
  • Is site served by adequate electrical, natural gas, water and sewer utilities for the project type?
  • Browse Files
    Cancelof
  • Is site served with a fiber optic line or equivalent service?
  • Browse Files
    Cancelof
  • If you are able to answer yes and/or have the necessary supplemental or mitigation documentation request for each item, your site may meet the requirements of the Site Ready program. Please continue your application. You may save your work and return later.

    If you had to answer no to any of these questions and do not have the required supplemental or mitigation documentation, your site likely does not qualify. Please contact us for assistance at 405-815-6552 and ask to speak to a Site Ready specialist.

  • Site Primary Contact Information

  •  -
  • Site Information

  • Availability:*
  • Identify all current property owners; including name, address and phone numbers:*
    Rows
  • Indicate any environmental, Phase I evaluations or other site studies that have been previously performed or are currently underway:*

  • Indicate the terrain of the site:*

  • Are there sharp elevation changes on site?*
  • Are there any areas with bodies of water, creeks, caves, natural springs, sink holes, wetlands, etc. on site?*
  • Educational Training

  • Either privately or publicly, does local area provide vocational / technical support to new or expanding industry?
  • List the five most recent training and startup assistance programs provided with local resources.
    Rows
  • Emergency Protective Services

  • Are police protection services at the county or municipal level?*
  • Public Officials

  •  -
  • Mayor or highest elected official's next election:*
     - -
  •  -
  •  -
  •  -
  • Current and Future Planned Zoning

  • For zoning questions, please refer to this guide to zoning definitions.

  • Will zone designation require change for intended usage?*
  • Economic Development Zones

  • Utility Service Providers

  • Utility Infrastructure

  • Are electric facilities with at least 20,000,000 kilowatt-hour (kWh)/monthly usage demand near or adjacent to the site?*
  • What electric service lines are available?*
    Rows
  • What is the approximate distance to the nearest substation that presently provides electric service to the site?*

  • Is dual-feed electric service an option for the site?*
  • Is natural gas service available at the site?*
  • Is municipal water service available at the site?*
  • What is the water service capacity and utilization?*
    Rows
  • Is municipal wastewater/sewer service available at the site?*
  • What is the sewer service capacity and utilization?*
    Rows
  • What types of telecommunications services are available to the site?*

  • How are telecommunication services delivered to the site?*

  • Does the site have access to a fiber optic line with dual bi-directional capabilities or equivalent service now?*
  • Is the Central Office (CO) central or remote?*
  • Is the equipment used at the Central Office (CO) digital or analog?*
  • Affirmation

  •  -
  • Should be Empty: